22MIS04D Campus Electrical & High Voltage Repair Phase IV (nr)
*****This project REQUIRES A DEPOSIT CHECK made payable to Consulting Construction Engineering *****$150  PER SET up to (2) sets*****
    
    
    
    
    
    
    
            
                                                Addendum 1
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | ||
| 0003-E3 | 1.0 MB | ||
| 0004-E4 | 395.9 KB | ||
| 0005-E5 | 279.6 KB | ||
| 0006-E6 | 268.0 KB | ||
| 0007-E7 | 635.9 KB | ||
| 0008-E8 | 434.5 KB | ||
| 0009-E9 | 417.0 KB | ||
| 0012-E12 | 314.9 KB | ||
| 0014-E14 | 315.1 KB | ||
| 0015-E15 | 332.1 KB | ||
| 0016-E16 | 328.2 KB | ||
| 0017-E17 | 413.3 KB | ||
| 0018-E18 | 326.1 KB | ||
| 0019-E19 | 320.2 KB | ||
| 0022-E22 | 414.6 KB | ||
| 0023-E23 | 308.2 KB | ||
| 0024-E24 | 303.6 KB | ||
| Addendum1-Specs | 199.3 KB | 
                                                Addendum 2
                
 (click to expand/collapse)
            
            
        
 (click to expand/collapse)
            
