22-0022 North Marshall Utilities Grant Park & Gunters Landing Tank Rehabilitations (nr)

The work consists of rehabilitation and upgrades to one elevated steel leg water storage tank and one ground level glass-fused-to-steel bolted water storage tank.
DIGITAL DOWNLOAD Complete Set (click to expand/collapse)
***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. *****
Order this section for $50.15
Name Date Size
0001-1 1/21/2025 1.3 MB
0002-2 1/21/2025 2.1 MB
0003-3 1/21/2025 1.0 MB
0004-4 1/21/2025 3.2 MB
0005-5 1/21/2025 1.3 MB
0006-6 1/21/2025 2.5 MB
0007-7 1/21/2025 2.3 MB
22-0022 Specs 1/21/2025 37.3 MB
HARD COPY Complete Set (click to expand/collapse)
***** This section is for Complete HARDCOPY Prints ONLY. *****
Order this section for $167.21
Name Date Size
0001-1 1/21/2025 1.3 MB
0002-2 1/21/2025 2.1 MB
0003-3 1/21/2025 1.0 MB
0004-4 1/21/2025 3.2 MB
0005-5 1/21/2025 1.3 MB
0006-6 1/21/2025 2.5 MB
0007-7 1/21/2025 2.3 MB
22-0022 Specs 1/21/2025 37.3 MB