22-0022 North Marshall Utilities Grant Park & Gunters Landing Tank Rehabilitations (nr)
The work consists of rehabilitation and upgrades to one elevated steel leg water storage tank and one ground level glass-fused-to-steel bolted water storage tank.
DIGITAL DOWNLOAD Complete Set
(click to expand/collapse)

***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. *****
Name | Date | Size | ||
0001-1 | 1/21/2025 | 1.3 MB | ||
0002-2 | 1/21/2025 | 2.1 MB | ||
0003-3 | 1/21/2025 | 1.0 MB | ||
0004-4 | 1/21/2025 | 3.2 MB | ||
0005-5 | 1/21/2025 | 1.3 MB | ||
0006-6 | 1/21/2025 | 2.5 MB | ||
0007-7 | 1/21/2025 | 2.3 MB | ||
22-0022 Specs | 1/21/2025 | 37.3 MB |
HARD COPY Complete Set
(click to expand/collapse)
