23-0035 State Energy Program IIJA Energy Efficient Retrofits for Hawk Pride Mountain Water System

The project consists of installing new variable frequency drives at the Water Treatment Plant and Booster Pump Station; installing SCADA hardware at the Water Treatment Plant and distribution system facilities; as well as integration of those facilities into the existing SCADA network.

Status

Accepting Bids

Prebid Date4/23/24 1:00pm

Bid Date5/9/24 1:00pm

Company & Contacts

The Kelley Group
Jessica Mandrell  
256-980-9438

Location

Tuscumbia AL

See Documents section above for additional bid requirements/info

Sealed bids will be received by the Hawk Pride Mountain Water System at the Hawk Pride Mountain Water System office, located at 200 New Bethel Road, Tuscumbia, AL 35674, until Thursday, May 9, 2024, at 1:00 P.M. CST, and then publicly opened and read aloud for furnishing all labor and materials, and performing all work described below:

IIJA Energy Efficient Retrofits

A non-mandatory pre-bid conference will be held virtually on Tuesday, April 23, 2024, at 1:00 P.M. CST. Instructions for attending the virtual pre-bid conference are included in the contract specifications.

The project consists of:

  • Installing new variable frequency drives at the Hawk Pride Water Treatment Plant and Booster Pump Station facilities.

  • Installing SCADA hardware at the Water Treatment Plant and distribution system facilities

  • Integration of those facilities into the existing Hawk Pride SCADA network.

ESTABLISHED Net 30 Alabama Graphics Account, cash/check, or credit card to purchase this project.